Saturday, 21 December 2019

The Dry Dock and Timber Pond PD (Part 2)

The Timber Pond in Pembroke Dockyard


In the age of wooden ships, naval dockyards (and civilian shipbuilders) used copious amounts of timber. The seasoning of timbers was an important aspect of ship construction if the constructor did not want the vessel to warp and bend unpredictably. Also, there was a need to intentionally bend and shape timbers and it was found that soaking in water made the bending of timbers easier.

By the middle of the nineteenth century it had been found that soaking timbers in salt water before working them allowed suppling or bending to be more easily performed. Also, the salt that impregnated the timber helped in its preservation, particularly if the timber was "in the log".

Originally the timber was stored in a timber pond that was on the foreshore at the the western end of the dockyard, on the beach at the end of what is now Fort Road. Indeed, the stumps of some of the timber piles that penned in the timbers can sometimes be seen during spring tides.

Notice the poles of the old timber pond on the beach at the end of Fort Road c1890
 This end of the dockyard also had a tidal inlet that almost ran, on spring tides, up to the site of the present main entrance of the yard, with Paterchurch on its southern bank. On the northern bank of this inlet the Admiralty dug (or extended) a large limestone quarry for building the eastern end of the yard. This quarry, the source of much of the building stone used in the early years of "The Yard", was later to become an obstacle to extending the works to the west and filling in and levelling the land for further building was to be a major expense. For more information about Paterchurch see my post here.

The diagrams below shows the basic design of the timber pond (Listed Grade II), taken from a the plan of the design held at The National Archives at Kew, London.(TNA Ref: WO 140/486).

Timber Pond with Google Earth Imagery

As above but with some transparency

The Timber Pond

The timber pond at Pembroke Dockyard, (also called the mast pond or pickling pond), is one of the few (perhaps the only?) masonry built example surviving in the British Isles. The quality of the stone work is of its time, crafted in individually cut, carboniferous limestone blocks. Fairly recent inspection reports reveal that the pond is in good condition. It has two large, brick lined, tunnel conduits running into it from the outside world. One of these, in the western wall of the pond, runs to an outfall on the beach at the end of Fort Road. This has a system of sluices and flap seals that can be used to drain and seal the pond as required. The other conduit runs from the north wall of the pond to the southern end of the graving dock, and was (probably?) used to fill the pond with water from the dock.

The diagram below shows this general arrangement of the Western Part of the dockyard. The numbers against some of the older buildings were allocated as part of a separate project to commemorate the Bicentennial of Pembroke Dock in 2014. They were for project identification purposes only.

Some people reading this post may not even be aware of the existing of the Timber Pond, which is hardly surprising, as unless you have access to the western part of the dockyard, it is hidden behind the impressive dockyard wall. Its relative anonymity does not make it any less important in its significance to the heritage of ship building at Pembroke Dock, and indeed Wales and probably the wider UK.

The timber pond c1890
It has been claimed that the timber pond was made redundant in about 1860, with technological advancement in naval architecture that began to introduce the use of iron (and later steel) in the construction of ships. This is not true, as the wood was still an important part of ship construction, not least for the building and fitting of robust masts and rigging for these early iron ships - hence the alternative name for the timber pond - The Mast Pond.  See some examples of such in the picture below.

HMS Penelope. Launched Pembroke Dock 1867



HMS Shannon. Launched Pembroke Dock 1875.


The Milford Haven Port Authority (MHPA) proposes to fill in the pond and cover it with a concrete slab as part of a speculative plan to make Pembroke (Dock) Marine a home for marine energy development. MHPA proposes to the fill the pond in so that damage to the structure is minimal, however, removing the concrete slab and extracting the fill would be a massively expensively task for anyone wishing to uncover the pond in the future. The pond is being effectively destroyed.

View across the drained timber pond from the southern edge looking north-west. 2014

Looking across the pond form the southern edge looking north-east. Not the conduit that leads to the dry dock. This is the block oval near the ramp in the northern wall. 2014

The timber pond in an old photograph, taken for the east. The other buildings visible have been demolished. c1970?

The timber pond appears under the wing tip of this photograph taken from a Pembroke Dock based flying boat in the 1930's.




In my next post I will explain the other dramatic changes that MHPA are planning to make to the western end of the dockyard. I will, in the future, discuss the notion of access for the general public to this, and other areas of the historic dockyard and the reasons why this is restricted at present.

Thanks for taking the trouble to read this post.

Have a good Christmas and very best wishes for 2020.